Connect Tech NT960/PCI Manuale Utente Pagina 71

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 88
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 70
Chapter 4: Appendix D - RS-485/422 Option 4-19
Intellicon-NT960/PCI User's Manual, ver. 0.02
Switch positions 5 and 6 on switch blocks S1, S2, S3, and S4
allow the "receiver stations" (RxD and CTS) to have either a DC
load of 150 ohms or an AC load of 150 ohms in series with a 50
nF capacitor. Please refer to the examples following for these
configuration options and their switch settings.
Examples:
1. The following example shows the switch settings for Station A
as per Figure 17 where TxD and RTS have a load of 150
.
switch blocks
S1, S2, S3, or S4
2. The following example shows the switch settings for Station B
and Station C as per Figure 17.
switch blocks
S1, S2, S3, or S4
3. The following example shows the switch settings for Station
D as per Figure 17 where RxD and CTS have a DC load of
150
..
switch blocks
S1, S2, S3, or S4
4. The following example shows the switch settings for Station
D as per Figure 17 where the circuit is > than 50 metres in
length and RxD and CTS have an AC load of 150
in series
with 50 nF.
switch blocks
S1, S2, S3, or S4
Vedere la pagina 70
1 2 ... 66 67 68 69 70 71 72 73 74 75 76 ... 87 88

Commenti su questo manuale

Nessun commento